[1] Lee, C.Y., Leon, V.J.:Machine scheduling with a rate-modifying activity. Eur. J. Oper. Res. 128(1), 119-128(2001) [2] Lodree Jr., E.J., Geiger, C.D.:A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration. Eur. J. Oper. Res. 201(2), 644-648(2010) [3] Zhao, C., Tang, H.:A note to due-window assignment and single machine scheduling with deteriorating jobs and a rate-modifying activity. Comput. Oper. Res. 39(6), 1300-1303(2012) [4] Ji, M., Cheng, T.E.:Scheduling with job-dependent learning effects and multiple rate-modifying activities. Inf. Process. Lett. 110(11), 460-463(2010) [5] Rustogi, K., Strusevich, V.A.:Single machine scheduling with general positional deterioration and rate-modifying maintenance. Omega 40(6), 791-804(2012) [6] Zhao, C.L., Tang, H.Y., Cheng, C.D.:Two-parallel machines scheduling with rate-modifying activities to minimize total completion time. Eur. J. Oper. Res. 198(1), 354-357(2009) [7] Hsu, C.J., Cheng, T.E., Yang, D.L.:Unrelated parallel-machine scheduling with rate-modifying activities to minimize the total completion time. Inf. Sci. 181(20), 4799-4803(2011) [8] Cheng, T.E., Hsu, C.J., Yang, D.L.:Unrelated parallel-machine scheduling with deteriorating maintenance activities. Comput. Ind. Eng. 60(4), 602-605(2011) [9] Yin, Y., Cheng, T.C.E., Xu, D., Wu, C.C.:Common due date assignment and scheduling with a ratemodifying activity to minimize the due date, earliness, tardiness, holding, and batch delivery cost. Comput. Ind. Eng. 63(1), 223-234(2012) [10] Yin, Y., Cheng, T.C.E., Wu, C.C., Cheng, S.R.:Single-machine batch delivery scheduling and common due-date assignment with a rate-modifying activity. Int. J. Prod. Res. 52(19), 5583-5596(2014) [11] Ji, M., Ge, J., Chen, K., Cheng, T.C.E.:Single-machine due-window assignment and scheduling with resource allocation, aging effect, and a deteriorating rate-modifying activity. Comput. Ind. Eng. 66(4), 952-961(2013) [12] Kellerer, H., Rustogi, K., Strusevich, V.A.:Approximation schemes for scheduling on a single machine subject to cumulative deterioration and maintenance. J. Sched. 16(6), 675-683(2013) [13] Yang, D.L., Yang, S.J.:Unrelated parallel-machine scheduling problems with multiple rate-modifying activities. Inf. Sci. 235(20), 280-286(2013) [14] Mosheiov, G., Sidney, J.B.:Scheduling a deteriorating maintenance activity on a single machine. J. Oper. Res. Soc. 61(5), 882-887(2010) [15] Kubzin, M.A., Strusevich, V.A.:Planning machine maintenance in two-machine shop scheduling. Oper. Res. 54(4), 789-800(2006) [16] Luo, W., Chen, L., Zhang, G.:Approximation algorithms for scheduling with a variable machine maintenance. In:Algorithmic Aspects in Information and Management, LNCS, vol. 6124, pp. 209-219. Springer, Berlin (2010) [17] Moore, J.M.:An n jobs, one machine sequencing algorithm for minimizing the number of late jobs. Manag. Sci. 15, 102-109(1968) [18] Lin, Y., Wang, X.:Necessary and sufficient conditions of optimality for some classical scheduling problems. Eur. J. Oper. Res. 176(2), 809-818(2007) [19] Hoogeveen, H., T'kindt, V.:Minimizing the number of late jobs when the start time of the machine is variable. Oper. Res. Lett. 40, 353-355(2012) |