Journal of the Operations Research Society of China ›› 2026, Vol. 14 ›› Issue (2): 547-564.doi: 10.1007/s40305-024-00545-0

• • 上一篇    下一篇

  

  • 收稿日期:2023-08-22 修回日期:2024-03-19 出版日期:2026-06-30 发布日期:2026-07-06
  • 通讯作者: Cheng He E-mail:hech202@163.com
  • 作者简介:Jing Wu,E-mail:wjing02022@163.com;Hao Lin,E-mail:linhao1974@163.com;Yuan Zhang,E-mail:zhangyuan2021@haut.edu.cn;Yan Zhao,E-mail:yanzhao@haut.edu.cn

The Unbounded Parallel-Batching Bicriteria Scheduling with Two-Component Jobs

Cheng He, Jing Wu, Hao Lin, Yuan Zhang, Yan Zhao   

  1. School of Science, Henan University of Technology, Zhengzhou 450001, Henan, China
  • Received:2023-08-22 Revised:2024-03-19 Online:2026-06-30 Published:2026-07-06
  • Contact: Cheng He E-mail:hech202@163.com
  • Supported by:
    This work was supported by the Natural Science Foundation of Henan province, China (No. 232300421218) and the National Natural Science Foundation of China (No. 12201186) and the Key project of scientific research for overseas students in Henan Province (No. 2020-70) and Innovation Fund project of Henan University of Technology (No. 2020ZKCJ08).

Abstract: This paper studies a bicriteria scheduling problem on a parallel-batching machine to minimizemaximum cost andmakespan simultaneously. Each job has two components: standard component and specific component. Standard components are processed in batches. Specific components are processed individually. The processing order of two components of a job has no constraint. A job is completed only when its two components are completed. For the simultaneous optimization scheduling problem, we design an O(n4)-time algorithm.

Key words: Bicriteria scheduling, Two-component, Makespan, Maximum cost, Pareto optimal schedules

中图分类号: