Journal of the Operations Research Society of China ›› 2026, Vol. 14 ›› Issue (2): 547-564.doi: 10.1007/s40305-024-00545-0
收稿日期:2023-08-22
修回日期:2024-03-19
出版日期:2026-06-30
发布日期:2026-07-06
通讯作者:
Cheng He
E-mail:hech202@163.com
作者简介:Jing Wu,E-mail:wjing02022@163.com;Hao Lin,E-mail:linhao1974@163.com;Yuan Zhang,E-mail:zhangyuan2021@haut.edu.cn;Yan Zhao,E-mail:yanzhao@haut.edu.cn
Cheng He, Jing Wu, Hao Lin, Yuan Zhang, Yan Zhao
Received:2023-08-22
Revised:2024-03-19
Online:2026-06-30
Published:2026-07-06
Contact:
Cheng He
E-mail:hech202@163.com
Supported by:中图分类号:
. [J]. Journal of the Operations Research Society of China, 2026, 14(2): 547-564.
Cheng He, Jing Wu, Hao Lin, Yuan Zhang, Yan Zhao. The Unbounded Parallel-Batching Bicriteria Scheduling with Two-Component Jobs[J]. Journal of the Operations Research Society of China, 2026, 14(2): 547-564.
| [1] Baker, K.R., Smith, J.C.: A multiple-criterion model for machine scheduling. J. Sched. 6, 7–16(2003) [2] Brucker, P.: Scheduling Algorithms, 3rd edn. Springer, Berlin (2001) [3] Brucker, P., Gladky, A., Hoogeveen, H., Kovalyov, M.Y., Potts, C.N., Tautenhahn, T., Van De Velde, S.L.: Scheduling a batching machine. J. Sched. 1(1), 31–54(1998) [4] Geng, Z.C., Yuan, J.J.: A note on unbounded parallel-batch scheduling. Inf. Process. Lett. 115(12), 969–974(2015) [5] Graham, R.L., Lawler, E.L., Lenstra, J.K., Rinnooy Kan, A.H.G.: Optimization and approximation in deterministic sequencing and scheduling: a survey. Ann. Discret. Math. 5, 287–326(1979) [6] He, C., Li, L.: Hierarchical optimization with two maximum costs on an unbounded parallel-batching machine. RAIRO-Oper. Res. 52, 55–60(2018) [7] He, C., Lin, Y.X., Yuan, J.J.: Bicriteria scheduling on a batching machine to minimize maximum lateness and makespan. Theoret. Comput. Sci. 381(1–3), 234–240(2007) [8] He, C., Lin, H., Yuan, J.J., Mu, Y.D.: Batching machine scheduling with bicriteria: maximum cost and makespan. Asia-Pacific J. Oper. Res. 31(04), 1–10(2014) [9] He, C., Wu, J., Xu, J.L., Wang, J.L.: An improved algorithm on unbounded parallel-batching scheduling to minimize maximum cost and makespan. RAIRO-Oper. Res. 57, 731–741(2023) [10] Hoogeveen, H.: Multicriteria scheduling. Eur. J. Oper. Res. 167(3), 592–623(2005) [11] Hoogeveen, J.A.: Single-machine scheduling to minimize a function of two or three maximum cost criteria. J. Algorithms. 21(2), 415–433(1996) [12] Li, S.G., Geng, Z.C.: Bicriteria scheduling on an unbounded parallel-batch machine for minimizing makespan and maximum cost. Inf. Process. Lett. 180, 106343(2023) [13] T’kindt, V., Billaut, J.-C.: Multicriteria scheduling problems: a survey. RAIRO-Oper. Res. 35(2), 143–163(2001) |
| 阅读次数 | ||||||
|
全文 |
|
|||||
|
摘要 |
|
|||||