Journal of the Operations Research Society of China ›› 2020, Vol. 8 ›› Issue (1): 133-143.doi: 10.1007/s40305-018-0210-x
所属专题: Scheduling
收稿日期:2017-09-06
修回日期:2018-01-17
出版日期:2020-03-30
发布日期:2020-02-18
通讯作者:
Ling-Fa Lu, Ru-Bing Chen, Jin-Jiang Yuan, Li-Qi Zhang
E-mail:lulingfa@zzu.edu.cn;zzucrb2009@163.com;yuanjj@zzu.edu.cn;zhangliqi2013@163.com
基金资助:Ru-Bing Chen1, Ling-Fa Lu1, Jin-Jiang Yuan1, Li-Qi Zhang2
Received:2017-09-06
Revised:2018-01-17
Online:2020-03-30
Published:2020-02-18
Contact:
Ling-Fa Lu, Ru-Bing Chen, Jin-Jiang Yuan, Li-Qi Zhang
E-mail:lulingfa@zzu.edu.cn;zzucrb2009@163.com;yuanjj@zzu.edu.cn;zhangliqi2013@163.com
中图分类号:
. [J]. Journal of the Operations Research Society of China, 2020, 8(1): 133-143.
Ru-Bing Chen, Ling-Fa Lu, Jin-Jiang Yuan, Li-Qi Zhang. Improved Approximation Algorithm for Scheduling on a Serial Batch Machine with Split-Allowed Delivery[J]. Journal of the Operations Research Society of China, 2020, 8(1): 133-143.
| [1] Potts, C.N.:Analysis of a heuristic for one machine sequencing with release dates and delivery times. Oper. Res. 28, 1436-1441(1980) [2] Hoogeveen, J.A., Vestjens, A.P.A.:A best possible deterministic on-line algorithm for minimizing maximum delivery time on a single machine. SIAM J. Discrete Math. 13, 56-63(2002) [3] van den Akker, M., Hoogeveen, H., Vakhania, N.:Restarts can help in the on-line minimization of the maximum delivery time on a single machine. J. Sched. 3, 333-341(2000) [4] Lee, C.Y., Chen, Z.L.:Machine scheduling with transportation considerations. J. Sched. 4, 3-24(2001) [5] Chang, Y.C., Lee, C.Y.:Machine scheduling with job delivery coordination. Eur. J. Oper. Res. 158, 470-487(2004) [6] Lu, L.F., Yuan, J.J.:Single machine scheduling with job delivery to minimize makespan. Asia-Pacific J. Oper. Res. 25, 1-10(2008) [7] Lu, L.F., Yuan, J.J.:Unbounded parallel batch scheduling problem with job delivery to minimize makespan. Oper. Res. Lett. 36, 477-480(2008) [8] Pei, J., Pardalos, P.M., Liu, X.B., Fan, W.J., Yang, S.L.:Serial batching scheduling of deteriorating jobs in a two-stage supply chain to minimize the makespan. Eur. J. Oper. Res. 244, 13-25(2015) [9] Chen,Z.-L.:Integrated production and outbound distribution scheduling:review and extensions.Oper. Res. 58, 130-148(2010) [10] Dror, M., Trudeau, P.:Savings by split delivery routing. Transp. Sci. 23, 23-37(1989) [11] Mullaseril, P., Dror, M., Leung, J.:Split-delivery routing heuristics in livestock feed distribution. J. Oper. Res. Soc. 48, 107-116(1997) [12] Archetti, C., Speranza, M.G.:The split delivery vehicle routing problem:a survey. The vehicle routing problem:latest advances and new challenges. Oper. Res. Comput. Sci. Interfaces Ser. 43(Part I), 103-122(2008) [13] Lu, L.F., Zhang, L.Q., Wan, L.:Integrated production and delivery scheduling on a serial batch machine to minimize the makespan. Theor. Comput. Sci. 572, 50-57(2015) [14] Webster, S.T., Baker, K.R.:Scheduling groups of jobs on a single machine. Oper. Res. 43, 692-703(1995) |
| 阅读次数 | ||||||
|
全文 |
|
|||||
|
摘要 |
|
|||||