[1] Harris, F.W.:How many parts to make at once. Factory, Mag. Manag. 10(2), 135-136, 152(1913):reprinted Oper. Res. 38, 947-950(1990). [2] Shih, W.:Optimal inventory policies when stockouts result from defective products. Int. J. Prod. Res. 18(6), 677-686(1980) [3] Porteus, E.L.:Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34(1), 137-144(1986) [4] Rosenblatt, M.J., Lee, H.L.:Economic production cycles with imperfect production processes. ⅡE Trans. 18(1), 48-55(1986) [5] Lee, H.L., Rosenblatt, M.J.:Simultaneous determination of production cycle and inspection schedules in a production system. Manag. Sci. 33(9), 1125-1136(1987) [6] Schwaller, R.L.:EOQ under inspection costs. Product. Inventory Manag. J. 29(3), 22-24(1988) [7] Zhang, X., Gerchak, Y.:Joint lot sizing and inspection policy in an EOQ model with random yield. ⅡE Trans. 22(1), 41-47(1990) [8] Cheng, T.C.E.:An economic order quantity model with demand-dependent unit production cost and imperfect production processes. ⅡE Trans. 23(1), 23-28(1991) [9] Ben-Daya, M., Hariga, M.:Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51(7), 875-881(2000) [10] Salameh, M.K., Jaber, M.Y.:Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64(1-3), 59-64(2000) [11] Cárdenas-Barrón, L.E.:Observation on:"Economic production quantity model for items with imperfect quality". Int. J. Prod. Econ. 67(2), 201(2000) [12] Hayek, P.A., Salameh, M.K.:Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control 12, 584-590(2001) [13] Chiu, Y.P.:Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng. Optim. 35(4), 427-437(2003) [14] Chan, W.M., Ibrahim, R.N., Lochert, P.B.:A new EPQ model:integrating lower pricing, rework and reject situations. Prod. Plan. Control 14, 588-595(2003) [15] Papachristos,S.,Konstantaras,I.:Economicorderingquantitymodelsforitemswithimperfectquality. Int. J. Prod. Econ. 100(1), 148-154(2006) [16] Liao, G.L.:Optimal production correction and maintenance policy for imperfect process. Eur. J. Oper. Res. 182(3), 1140-1149(2007) [17] Wee, H.M., Yu, J., Chen, M.C.:Optimal inventory model for items with imperfect quality and shortage backordering. Omega 35(1), 7-11(2007) [18] Eroglu, A., Ozdemir, G.:An economic order quantity model with defective items and shortages. Int. J. Prod. Econ. 106(2), 544-549(2007) [19] Maddah, B., Jaber, M.Y.:Economic order quantity for items with imperfect quality:revisited. Int. J. Prod. Econ. 112(2), 808-815(2008) [20] Cárdenas-Barrón, L.E.:Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput. Ind. Eng. 57(3), 1105-1113(2009) [21] Sana, S.S.:An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201(1), 158-170(2010) [22] Maddah, B., Salameh, M.K., Moussawi-Haidar, L.:Order overlapping:A practical approach for preventing shortages during screening. Comput. Ind. Eng. 58(4), 691-695(2010) [23] Chang, H.C., Ho, C.H.:Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering. Omega 38(3-4), 233-237(2010) [24] Chung, K.J.:The economic production quantity with rework process in supply chain management. Comput. Math. Appl. 62(6), 2547-2550(2011) [25] Liao, G.L., Sheu, S.H.:Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance. Int. J. Prod. Econ. 130(1), 118-124(2011) [26] Hsu, J.-T., Hsu, L.-F.:A note on "Optimal inventory model for items with imperfect quality and shortage backordering. Int. J. Ind. Eng. Comput. 3(5), 939-948(2012) [27] Khan, M., Jaber, M.Y., Guiffrida, A.L., Zolfaghari, S.:A review of the extensions of a modified EOQ model for imperfect quality items. Int. J. Prod. Econ. 132(1), 1-12(2011) [28] Jaber, M.Y., Zanoni, S., Zavanella, L.E.:Economic order quantity models for imperfect items with buy and repair options. Int. J. Prod. Econ. 155, 126-131(2014) [29] Taleizadeh, A.A., Khanbaglo, M.P.S., Cárdenas-Barrón, L.E.:An EOQ inventory model with partial backordering and reparation of imperfect products. Int. J. Prod. Econ. 182, 418-434(2016) [30] Li, N., Chan, F.T., Chung, S.H., Tai, A.H.:A stochastic production-inventory model in a two-state production system with inventory deterioration, rework process, and backordering. IEEE Trans. Syst. Man Cybern. Syst. 47(6), 916-926(2017) [31] Skouri, K.:An EOQ model with backlog-dependent demand. Oper. Res. Int. Journal 18(2), 561-574(2018) [32] Ross, S.:Probability and statistics for engineers and scientists. Elsevier Academic Press, Canada (2004) [33] Yoo, S.H., Kim, D., Park, M.S.:Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. Int. J. Prod. Econ. 121(1), 255-265(2009) [34] Khan, M., Jaber, M.Y., Bonney, M.:An economic order quantity (EOQ) for items with imperfect quality and inspection errors. Int. J. Prod. Econ. 133(1), 113-118(2011) [35] Hsu, L.-F.:A note on An economic order quantity (EOQ) for items with imperfect quality and inspection errors. Int. J. Ind. Eng. Comput. 3(4), 695-702(2012) [36] Hsu, L.-F.:Erratum to "An economic order quantity (EOQ) for items with imperfect quality and inspection errors". Int. J. Prod. Econ. 136(1), 253(2012) [37] Hsu, J.-T., Hsu, L.-F.:Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns. Comput. Ind. Eng. 64(1), 389-402(2013) [38] Glock, C.H., Jaber, M.Y.:A multi-stage production-inventory model with learning and forgetting effects, rework and scrap. Comput. Ind. Eng. 64(2), 708-720(2013) [39] Khan, M., Jaber, M.Y., Ahmad, A.-R.:An integrated supply chain model with errors in quality inspection and learning in production. Omega 42(1), 16-24(2014) [40] Mohammadi,B.,Taleizadeh,A.A.,Noorossana,R.,Samimi,H.:Optimizingintegratedmanufacturing and products inspection policy for deteriorating manufacturing system with imperfect inspection. J. Manuf. Syst. 37(1), 299-315(2015) [41] Zhou, Y., Chen, C., Li, C., Zhong, Y.:A synergic economic order quantity model with trade credit, shortages, imperfect quality and inspection errors. Appl. Math. Model. 40, 1012-1028(2016) [42] Sarkar, B., Saren, S.:Product inspection policy for an imperfect production system with inspection errors and warranty cost. Eur. J. Oper. Res. 248(1), 263-271(2016) [43] Cheikhrouhou, N., Sarkar, B., Ganguly, B., Malik, A.I., Batista, R., Lee, Y.H.:Optimization of sample size and order size in an inventory model with quality inspection and return of defective items. Ann. Oper. Res. 271(2), 445-467(2018) [44] Yang, C.T., Ho, C.H., Lee, H.M., Ouyang, L.Y.:Supplier-retailer production and inventory models with defective items and inspection errors in non-cooperative and cooperative environments. RAIRO Oper. Res. 52(2), 453-471(2018) [45] Dey, O., Giri, B.C.:A new approach to deal with learning in inspection in an integrated vendor-buyer model with imperfect production process. Comput. Ind. Eng. 131, 515-523(2019) [46] Flapper,S.D.P.,Fransoo,J.C.,Broekmeulen,R.A.C.M.,Inderfurth,K.:Planningandcontrolofrework in the process industries:a review. Prod. Plan. Control 13(1), 26-34(2002) [47] Duffuaa, S.O., Khan, M.:A general repeat inspection plan for dependent multicharacteristic critical components. Eur. J. Oper. Res. 191, 374-385(2008) [48] Raouf, A., Jain, J.K., Sathe, P.T.:A cost-minimization model for multi characteristic component inspection. ⅡE Trans. 15(3), 187-194(1983) [49] Duffuaa, S.O., Khan, M.:An optimal repeat inspection plan with several classifications. J. Oper. Res. Soc. 53(9), 1016-1026(2002) [50] Duffuaa, S.O., Khan, M.:Impact of inspection errors on the performance measures of a general repeat inspection plan. Int. J. Prod. Res. 43(23), 4945-4967(2005) [51] Khan, M., Ahmad, A.-R., Hussain, M.:Integrated decision models for a vendor-buyer supply chain with inspection errors and purchase and repair options. Int. J. Adv. Manuf. Technol. 104, 3221-3228(2019) [52] Ross, S.M.:Introduction to Probability Models. Academic Press Inc., Cambridge (1989) [53] Duffuaa, S.O., Nadeem, I.A.:A complete inspection plan for dependent multicharacteristic critical components. Int. J. Prod. Res. 32(8), 1897-1907(1994) [54] Lee, H.L.:On the optimality of a simplified multicharacteristic component inspection model. ⅡE Trans. 20(4), 392-398(1988) [55] Buscher, U., Lindner, G.:Optimizing a production system with rework and equal sized batch shipments. Comput. Oper. Res. 34, 515-535(2007) [56] Dorris, A. L., Hoag, L. L., Kasiviswanathan, G.:Inspector error models:an empirical investigation. In:Proceedings of the Human Factors Society 21st Annual Meeting, pp. 137-141(1977). https://doi.org/10.1177/107118137702100211 [57] Reddy, J.N.:An Introduction to the Finite Element Method. McGraw-Hill, New York (1993) [58] Hughes, T.J.R.:The Finite Element Method:Linear Static and Dynamic Finite Element Analysis. Prentice-Hall, Englewood Cliffs (1987) [59] Rao, S.S.:The Finite Element Method in Engineering. Elsevier Inc., Amsterdam (2011) [60] Lopes, R.:Integrated model of quality inspection, preventive maintenance and buffer stock in an imperfect production system. Comput. Ind. Eng. 126, 650-656(2018) |