Analytics of an Imperfect Four-Layer Production Inventory Model Under Two-Level Credit Period Using Branch-and-Bound Technique

Expand
  • Department of Applied Mathematics with Oceanology and Computer Programming, Vidyasagar University, Midnapore W. B. 721102, India

Received date: 2019-04-05

  Revised date: 2019-09-06

  Online published: 2022-11-09

Supported by

This research work was supported by Council of Scientific and Industrial Research, Human Resource Development Group, India (No. 25(0276)/17/EMR-II).

Abstract

This paper explains an integrated production inventory supply chain model, which consists of a supplier, a manufacturer and a retailer under two-level credit period. One is manufacturer’s credit period offered by the supplier, and other is retailer’s credit period offered by the manufacturer. Here, the manufacturer replenishes raw materials from the supplier and produces non-deteriorating products in some cycles of equal length. It is noted that here four inventory structures have been considered to show the flow of the materials as either raw materials or finished products from supplier to retailer via manufacturer. Also in this model, manufacturer’s imperfect production has been considered. Here imperfect items are not repairable. The retailer receives good finished products from the manufacturer and sells these to his/her customers during some cycles of equal length in total time horizon. Our main objective is to find the optimal number of production and business cycles of the manufacturer such that the integrated system can get the maximum profit. The above discussed model is elaborated with the help of a numerical example, and a sensitivity analysis is done with respect to some parameters used in this model.

Cite this article

Subrata Panja, Shyamal Kumar Mondal . Analytics of an Imperfect Four-Layer Production Inventory Model Under Two-Level Credit Period Using Branch-and-Bound Technique[J]. Journal of the Operations Research Society of China, 2022 , 10(4) : 725 -748 . DOI: 10.1007/s40305-020-00300-1

References

[1] Banerjee, A.: A joint economic-lot-size for purchaser and vendor. Decis. Sci. 17, 292–311(1986)
[2] Zhang, X., Gerchak, Y.: Joint lotsizing and inspection policy in an EOQ model with random yield. IIE Trans. 22(1), 41–47(1990)
[3] Mondal, S.K., Maiti, M.: Multi-item fuzzy EOQ models using genetic algorithm. Comput. Ind. Eng. 44(1), 105–117(2003)
[4] Banu, A., Mondal, SK.: Analysis of credit linked demand in an inventory model with varying ordering cost. Springer plus, 5, 926. https://doi.org/10.1186/s40064-016-2567-9(2016)
[5] Manna, A.K., Dey, J.K., Mondal, S.K.: Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104, 9–22(2017)
[6] Goyal, S.K.: An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15(1), 107–111(1976)
[7] Yang, C.P., Wee, M.H.: An integrated multi-lot-size production inventory model for deteriorating inventory item. Comput. Oper. Res. 30(5), 671–682(2003)
[8] Wee, H.M., Law, S.T.: An integrated production inventory model for ameliorating and deteriorating items taking account of time discounting. Math. Comput. Model. 43(5–6), 673–685(2006)
[9] Das, B.C., Das, B., Mondal, S.K.: Integrated supply chain model for deteriorating item with procurement cost dependent credit period. Comput. Ind. Eng. 64, 788–796(2012)
[10] Ouyang, L.Y., Wu, K.S., Ho, C.H.: An integrated vendor-buyer inventory model with quality improvement and lead time reduction. Int. J. Prod. Econ. 108, 349–358(2007)
[11] Das, B.C., Das, B., Mondal, S.K.: Optimal transportation and business cycles in an integrated production-inventory model with a discrete credit period. Transport. Res. E-Log. 68, 1–13(2014)
[12] Manna, A.K., Dey, J.K., Mondal, S.K.: Three-layer supply chain in an imperfect production inventory model with two storage facilities under fuzzy rough environment. J. Uncertain. Anal. Appl. 2(1), 17(2014)
[13] Das, B.C., Das, B., Mondal, S.K.: An integrated production inventory model under interactive fuzzycredit period for deteriorating item with several markets. Appl. Soft. Comput. 28, 453–465(2015)
[14] Das, B.C., Das, B., Mondal, S.K.: An integrated production-inventory model with defective item dependent stochastic credit period. Comput. Ind. Eng. 110, 255–263(2017)
[15] Goyal, S.K.: Economic order quantity under conditions of permissible delay in payments. J. Oper. Res. Soc. 36(4), 335–338(1985)
[16] Aggarwal, S.P., Jaggi, C.K.: Ordering policies of deteriorating items under permissible delay in payment. J. Oper. Res. Soc. 46, 658–662(1995)
[17] Chu, P., Chung, S.P., Lan, S.P.: Economic order quantity of deteriorating items under permissible delay in payments. Comput. Oper. Res. 25, 817–824(1998)
[18] Chung, K.J.: The inventory replenishment policy for deteriorating items under permissible delay in payments. Comput. Ind. Eng. 37, 267–281(2000)
[19] Huang, Y.F.: Optimal retailer’s replenishment policy for the EPQ model under the supplier’s trade credit policy. Prod. Plan. Control 15, 27–33(2004)
[20] Krichen, S., Laabidi, A., Abdelaziz, F.B.: Single supplier multiple cooperative retailer’s inventory model with quality discount and permissible delay in payments. Comput. Ind. Eng. 60, 164–172(2011)
[21] Abad, P.L., Jaggi, C.K.: A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive. Int. J. Prod. Econ. 83, 115–122(2003)
[22] Huang, Y.F.: Optimal retailers ordering policies in the EOQ model under trade credit financing. J. Oper. Res. Soc. 54, 1011–1015(2003)
[23] Ho, C.H.: The optimal integrated inventory policy with price—and—credit lined demand under two level trade credit. Comput. Ind. Eng. 60, 117–126(2011)
[24] Min, J., Zhou, Y.W., Zhao, J.: An inventory model for deteriorating items under stock dependent demand and tw level trade credit. Appl. Math. Model. 34, 3273–3285(2010)
[25] Huang, Y.F.: An inventory model under two level of trade credit and limited storage space derived without derivatives. Appl. Math. Model. 30, 418–436(2006)
[26] Sana, S.S., Chaudhuri, K.S.: A deterministic EOQ model with delays in payments and price-discount offers. Eur. J. Oper. Res. 184, 509–533(2008)
[27] Teng, J.T., Yang, H.L., Chern, M.S.: An inventory model for increasing demand under two levels of trade credit linked to order quantity. Appl. Math. Model. 37, 7624–7632(2013)
[28] Rosenblatt, M.J., Lee, H.L.: Economic production cycles with imperfect production processes”. IIE Trans. 18, 48–55(1986)
[29] Salameh, M.K., Jaber, M.Y.: Economic production quantity model for items with imperfect quality”. Int. J. Prod. Econ. 64, 59–64(2000)
[30] Cheng, T.C.E.: An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Trans. 23, 23–28(1991)
[31] Lin, C.S., Chen, C.H., Kroll, D.E.: Integrated production-inventory models for imperfect production processes under inspection schedules. Comput. Ind. Eng. 44, 633–650(2003)
[32] Manna, A.K., Dey, J.K., Mondal, S.K.: Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration. J. Ind. Prod. Eng. 35, 57–73(2018)
[33] Ganesan, T., Vasant, P., Elamvazuthi, I.: Advances in Metaheuristics: Applications in Engineering Systems, 1st Edition, CRC Press, (2016)
[34] Vasant, P., Zelinka, I., Weber, GW.: Intelligent Computing & Optimization. Conference proceedings ICO 2018, Springer, Cham. (2018)
Options