Batch Scheduling with Deteriorating Jobs to Minimize the Total Completion Time

Expand

Online published: 2013-09-30

Abstract

We consider bounded parallel-batch scheduling with proportional-linear
deteriorating jobs and the objective to minimize the total completion time. We give
some properties of optimal schedules for the problem and present for it a dynamic
programming algorithm running in O(b2m22m) time, where b is the size of a batch
and m is the number of distinct deterioration rates.

Cite this article

Cu-Xia Miao · Yun-Jie Xia · Yu-Zhong Zhang · Juan Zou . Batch Scheduling with Deteriorating Jobs to Minimize the Total Completion Time[J]. Journal of the Operations Research Society of China, 2013 , 1(3) : 377 -384 . DOI: 10.1007/s40305-013-0019-6

Options
Outlines

/